A little warmer last night. I got a good start on the shoe rack. Yesterday, I finished the construction phase. Today, I applied the Varathane.
I have finished with the first coat of Varathane. It took quite a while. I started with the rack upside down. I applied it to the bottom of each shelf and both sides and both ends. It took a lot for the first coat.
While it was drying I dug more holes for the posts. I poured water in them last night and it was fairly easy digging, but hard to remove the soil when they were very deep. They needed to be two feet deep.
I then put on the first coat of Varathane. I painted the bottom of each shelve first. It took a lot more than the other coats took. I panted both ends and both sides. I turned the rack over and painted the top of each shelve.
I then drove to Fillmore for the posts. I was going to get three eight footers and three twelve footers. The twelve foots were not treated. I ended up getting six eight footers. I also got two bags of concrete mix. Shane carried out the two eighty pound bags.
The treated post and bags are in this photo.
I gave the rack and other coat of Varathane. When I brought it into house. It was still a little tacky. I put it in the closet where it will go. Carol will fill it with her shoes in the morning.
Comments and questions are welcome.
I write all most every day of what goes on in our home in the garden and in the nursery. We are ordinance workers at the Manti Temple on the Tuesday morning shift and the Saturday evening shift. In addition there are several trips to Utah county a couple of times a month and a few short trips to other mountain west areas. Our family is most important to us. All of our children live in Utah except one who lives in Kentucky.
Followers
Showing posts with label Varathane. Show all posts
Showing posts with label Varathane. Show all posts
Thursday, November 7, 2019
Subscribe to:
Posts (Atom)




