Followers

Tuesday, October 19, 2021

New Furnace

A regular morning.  Scriptures, Breakfast, and Greenhouses.  Andrew Brown called and said that he would be here to install the new furnace 8:30 to 9:00.  He didn't get here until eleven.  I took out the two wheeled cart.  Andrew and his helper loaded the furnace on the cart.  He pulled it to house five.  They removed all of the wirering, gas connection, and the chimney from the old furnace.  That took some time.  They removed the packing material and put it on the metal frame where the old was.

They put the new furnace on its side on the frame.  They made a new hole for the chimney.  It was to high.  We pulled away the wood that was underneath which lowered the furnace.  They then put the chimney through the hole.  They made other adjustments.

The above photo shows the new position of the chimney. It took a few more adjustments before it was securely fasten to the east wall of the greenhouse.

The old furnace moved out of the way.  It soon will be at the dump.
I uncovered the plants that were laying on the ground.  They were in good condition.  I rolled up the piece of weed barrier leaned it against the inside west wall.
Shane helped me stand up the palm tree. We pulled it out of the pot and put in new soil so it would stand straight.  We put in to much soil.  We took some out and it is standing pretty straight by leaning against the door header. 
There was a three foot wide piece of weed barrier that was at least a hundred feet long.  I laid it on the back lawn.  I was able to fold it several times and then roll up the last little bit.  A piece of twin is holding it from unrolling.
The Mike Blazard garage is nearly finished.
The furnace was on this pallet.  I started to take it apart and use the wood.  I gave up.   I couldn't pull out the nails.

Please LIKE, SHARE and LEAVE A COMMENT! We want to hear from you!


No comments:

Post a Comment