Followers

Friday, November 16, 2018

Revere Health and and MRi

We left home this morning about 6:35.  Carol had an appointment for an MRI at Revere Health in Salem, Utah.  The traffic at that time in the morning  was not to heavy, but it was steady going south, but going north as were, there were not nearly as many cars going that way.  
By the time we were at the Yuba lake exit there was a beautiful sunrise.  I took this picture out of the car window while we were driving.  It was much prettier than the photo.
The Revere Health Center is huge.  There are two levels.  We walked into the entrance where we stopped at the receptionist.  She told us which way to go.  We checked in there.  The receptionist there checked Carol in.  They have sort of an iPad that Carol did what the receptionist does.  We were escorted to a small dressing room.  She was instructed to remove all jewelry and all her clothing that had contained any metal.  She then put a pair of pants and a blouse.  There was a locker for her clothing.  I took the key and Carol went for the MRI.  The technician said that it would take about thirty-five minutes.  I went back to the car and got my iPad.
In the above picture hangs picture on a wall made with old barn wood.  It was quite attractive.

We drove back to Walmart and bought a whole bunch of toys for our grandkids, and great grandkids.  We were in there for over and our.

We then went to the east bay Walmart and bought some supplies and a few toys.
We had lunch at the Great China Restaurant.  We eat here quite often on our trips to Utah County.
We stopped at Steve Regans in Spanish for where I got some triple twenty Peters fertilizer.
I don't remember where this small piece of furniture was. it was marked with a $150.00 tag.  It looked pretty easy to build.

When we got home I unloaded the car.  That took many trips between the car and the kitchen.
I walked out to the greenhouse to see how things were doing.  Everything looked good.   I cut a kohlrabi and some lettuce for the chickens.
A garage/shop is being built across the street and a little to the west of us.  They are preparing the floor for concrete.  There is a large pile of gravel in the front part of the garage.


Comments and questions are welcome.





No comments:

Post a Comment