Richard a couple of weeks ago, gave us some small almonds. Carol had removed the nuts on some of them. After lunch we worked for nearly an hour cracking them.
We got a small bag of nuts.
The rafters on the back header were attached to the header with 5 1/2 inch lag screw. They were not attached every two feet. There were three roofing sheets on top of the rafters. Some were screwed into the rafters. I removed all the screws. I then removed each lag screw and slid it into the right positions and put in the lag screw.
I had to make a new pilot hole. I did for all eight of the rafters. I was pleasantly surprised that the lines on the sheathing were mostly over the rafter. I started to put in the screw. Some of the rafters were bowed either to the left of to the right. I used a pipe clamp the pull them into position and then screwed them down. Before I left the roof I screwed the three sheathing down. I put all of the tools on the cart and put them in house three.
We had re-fried potatoes, sausage, and one gladiator tomato.
Comments and questions are welcome.
No comments:
Post a Comment